| URANIUM NORTH RESOURCES CORP,. : http://www.uraniumnorth.com/ : QwikReport |
| Amer Lake - Overview |






YEAR |
HISTORY OF EXPLORATION ON THE AMER LAKE PROPERTY |
1969 |
A regional airborne radiometric survey was flown by Aquitaine. Uranium mineralization was located in sandstones near prominent radiometric anomalies and 85 Mineral Claims were staked in the Amer Lake area. |
1970 |
A detailed radiometric survey was flown by Aquitaine. Anomalies were explored on the ground. 8,170 metres of drilling in 37 holes (AML-1 to 37) were completed on the Main and Faucon showings. |
1972 |
Geological mapping, lake sediment and limited soil sampling, scintillometer prospecting and geological mapping were completed by Aquitaine. |
1975 |
A field examination was completed by Aquitaine and their associated company Societe National des Petroles d'Aquitaine, and 14 bedrock samples were collected for petrographic analysis. |
1976 |
Uranerz completed a reconnaissance airborne radiometric survey which covered parts of the Amer Lake map area. The survey outlined several areas of anomalies, most over areas previously staked by Aquitaine. Preliminary checks were performed and claims were staked. |
1977 |
Cominco conducted geological mapping and prospecting of the property at 1:10,000, detailed mapping at 1:1,000 and 1:500 over areas of higher grade mineralization, and re-logging and re-sampling of 8 of Aquitaine's DDH. Nine drill holes totalling 445 metres (77-1 to 9) was completed; three drill holes were completed on showing A, five drill holes were completed on showing B, and one drill hole was completed on the Faucon showing. |
1977 |
Uranerz completed detailed geological mapping and prospecting of airborne radiometric anomalies from a 1976 survey, and reconnaissance mapping of the entire Amer Lake fold belt. Additional claims were staked. |
1978 |
Uranerz completed regional mapping, ground and airborne radiometrics, ground magnetics and VLF surveys over selected areas, detailed geology and prospecting, and sampling of mineralized showings and boulders. A continuous mineralized horizon was found with local highs of radioactivity in excess of 15,000 cps. Blasting of two trenches in areas of known mineralization plus mapping and sampling of the trenches. |
1981 |
Uranerz completed 14 drill holes totalling 700 metres (HL-1 to 14) on the Horned Lake target as well as excavation of a small trench, a magnetometer survey of 16.2 line-km, reconnaissance and grid EM-16 survey of 26 line-km and detailed grid mapping covering 3km2. |
| Copyright © 2010 by Uranium North Resources Corp,. All rights reserved worldwide. |